Deployment timelines depend on the route. A connection on existing owned fiber turns up faster than one that needs new construction to reach a site. Here is how the process runs, and where it moves fastest.

How a Lightpath connection gets deployed

Survey and design

  • We confirm the route, the building entrances and the diversity available on owned fiber, then finalize the design.

Construction where it is needed

  • Where fiber does not yet reach a site, we build it. Construction timelines vary by route, permitting and right-of-way.

Splice and turn-up

  • We light the connection and hand off at the agreed capacity.

Acceptance and handoff to support

  • We test against the SLA where applicable, then the route moves to NOC monitoring and your support team.
Our Network

When the route is already in place

Rapidpath

For inter-data-center dark fiber across the New York metro, Greater Boston and Greater Miami, the spans are pre-spliced and OTDR-tested before you order, so Rapidpath can turn up in as few as 15 business days on qualifying routes. Phoenix follows in Q4 2026, with Chicago and Columbus after that.

Rapidpath

Request a route review

Start with the route, then talk pricing.

Complete the forum to receive a customized route validation assessment by a Lightpath engineer.

    Optional